Doors · Tilbury Docks
Tilbury Docks – Installation of sectional doors
24 double-skinned galvanised steel sectional doors and two steel fire escape doors, delivered in five weeks.
About the project
Working with Gallagher Contractors Limited on the Tilbury Docks project, Arkas engineers designed, supplied, delivered and installed 24 double-skinned galvanised steel sectional doors.
Two Framex steel flush fire escape doors and frames were also supplied and installed. These were fitted with panic exit hardware and powder-coated to the client's specification.
The project took five weeks in total, from acceptance of the quote to final completion, and complied with British Standard safety guidelines including BS EN 12604 and BS EN 12453.
Our engineers work efficiently alongside other contractors to deliver industrial door projects to a high standard within demanding timescales.
- 24 double-skinned galvanised steel sectional doors
- 2 Framex steel fire escape doors with panic hardware
- Powder-coated to specification
- Five weeks from quote to completion
- Client
- Gallagher Contractors Limited
- Location
- Tilbury Docks
- Category
- Doors
Project details
Project gallery
Products used on this project
Talk to us about your project
Send us the details, photos or drawings and we will arrange a free site survey.
Areas we cover
- London
- Kent
- East Sussex
- West Sussex
- Surrey
- Essex