Gates · Isle of Grain
UNIPER, Isle of Grain Power Station
An 8.5 metre automatic cantilever gate, installed in 10 days while the old gates kept the site secure.
About the project
This project was completed while the old gates on site were still operational, so the site stayed secure at all times while the works were going on.
We installed a new 8.5 metre automatic cantilever gate to replace the old, faulty bi-folding gates that had been installed when the site was built.
We completed the project over a 10 day period, from start to handover.
- 8.5 metre automatic cantilever gate
- Replaced faulty bi-folding gates
- Site kept secure throughout
- 10 days from start to handover
- Client
- UNIPER
- Location
- Isle of Grain
- Category
- Gates
- Completed
- 2019
Project details
Project gallery
Products used on this project
Talk to us about your project
Send us the details, photos or drawings and we will arrange a free site survey.
Areas we cover
- London
- Kent
- East Sussex
- West Sussex
- Surrey
- Essex